Projects
Illustrates our Project categories and listing with associated data sheets, which can be downloaded immediately...
Please select a project category - Associated data sheets can be downloaded for items marked with *
Commercial Industrial Infrastructure Residential Advocacy Building & ProposalsCondition Assessment Energy QA/QC Consultancy HSE Consultancy
Commercial Projects ^top of page^
Client | Project | Owner | Year | Description |
Sant's Rentals* | Head Office, Point Lisas | Sant's Rentals | 2004 | Design and drawings for a 550m2 office and warehouse building for an equipment rental business |
West Cosat Construction* | Smuggler's Cove, Barbados | N. Jordan | 2006 | Structural analysis, design and drawings for 5-storey luxury 3,200m2 apartment block on the prestigious West coast of Barbados |
T. Anderson* | Apartment buildings, Piarco | T. Anderson | 2006 | Full design and drawings for a 10-unit apartment block of 1,115m2 rental area |
Servus Limited |
UTC Branch Office, Couva | Unit Trust Corporation | 2008 | Design and drawings for external facilities to UTC offices |
Servus Limirrted* |
BG House Refurbishment, POS | BG Trinidad and Tobago | 2009 | Management & co-ordination services to a major Class A corporate headquarters |
Dr. F Khan* | Office Building, Tobago | Dr. F Khan | 2009 | Architectural and structural design and drawings for a three-storey office building providing 890m2 of rentable area |
RR Investments* | High Street Arcade Refurbishment | RR Investments | 2014 | |
Croton LLC* | Sun Delight Fire Assessment | Sun Delight Limited | 2013 | |
Nestle Caribbean* | Filling Room Modifications | Nestle Caribbean | 2013 | |
Associated Services Limited* | New Head office and warehouse facility | ServisAir | 2011 | |
Servus Limited* | Technical auditor for major office development | International Financial Corporation | 2010 | |
Servus Limited* | Condition assessment for UTC Tobago after fire event | Unit Trust Corp | 2010 |
Industrial Projects ^top of page^
Client | Project | Owner | Year | Description |
Enman Services Ltd. | Titan Methanol pipe supports, Point Lisas | Titan Methanol | 2004 | Analysis and design of pipework supports to remedy settlement prolems |
P N Enterprises Ltd* | Titan Methanol warehouse, Point Lisas | Titan Methanol | 2004 | Structural design of a storage warehouse located within Titan methanol |
Red Cap Designs* | Office & warehouse, Point Lisas | Red Cap Designs | 2005 | Structural analysis and design drawings for 1500m2 storage and office facility |
Red Cap Designs | Warehouse, Point Lisas | Proman GmBH | 2005 | Structural analysis and design drawings for 80m2 warehouse facility |
Comcon (Barbados) Ltd.* | Silo supports | Mittal Steel | 2005 | Structural analysis, design and drawings for 40tph lime and briquette plant supports and trestles |
Trinity Power | Head Office Crack repairs, Point Lisas | Trinity Power | 2006 | Investigation and assessment of localised carking to existing Head Office building |
Sampete Holdings Ltd. | Lime plant, Wallerfield | Sampete Holdings Ltd. | 2009 | Structural design and drawings for a major lime plant foundations sized at 25tph |
Tower Engineering* | Design of a retaining wall in sloping and expansive ground | Digicel Trinidad | 2011 |
Infrastructure Projects ^top of page^
Client | Project | Owner | Year | Description |
Universal Projects Limited | Desalination Plant, Point Lisas | IONICS (Trinidad) Limited | 2001 | Design of earthworks excavation supports for 600mm diameter underground water main |
Universal Projects Limited | Beetham Wastewater Treatment Works, Port of Spain | BIWATER LTD. | 2001 | Design of foundation base for tower crane |
Southern Maintenance Ltd. | bptt Access Roads, Mayaro | bptt | 2002 | Design of 250m access road across existing operational facility |
W S Atkins* | Solomon Hochoy Highway Extension | Comylsa Lain | 2003 | Provision of local consultancy support to intenational consultants in aggregate material assessments |
P N Enterprises Ltd | Retaining wall | P N Enterprises Ltd | 2004 | Structural design of a 4.5m high reinforced concrete/masonry retaining wall to a commercial enterprise |
Rainbow Construction Ltd.* | Lady Hailes Housing Development | Housing Development Corporation | 2007 | Infrastructure design and drawings (roads, drainage, water and wastewater) for a 200-unit, 7hectare middle income housing development |
PSAEL* | rinity Bridge, Guayaguayare | Ministry of Local Government | 2007 | Design and Project Management of an 16m three-span access bridge |
PSAEL | 6th Company Recreation Ground | Ministry of Local Government | 2009 | Design and Project Management of a community recreation ground including pavilion, multipurpose court, fieldworks and night lighting |
PSAEL | Santa Flora canteen | Petrotrin | 2009 | Design and drawings for a canteen re-construction |
SPORTT* | Fanny village recreation grounds, Point Fortin | Point Fortin Borough Corporation | 2007 | Design and Project Management of a community recreation ground upgrade including fieldworks, jogging track and night lighting |
Associated Services Limited | Marabella Stadium | Ministry of Sports & Youth Affairs | 2007 | Project Management of consultants and contractors for a major regional sporting facility comprising pavilion, fieldworks and outdoor facilities |
Associated Services Limited* | Mahaica Pavilion | Ministry of Sports & Youth Affairs | 2007 | Structural engineering for a 5,200m2 pavilion faciliity incorporating major design codes |
Corrosion & Environmental Services Ltd.* | Godineaux Bridge, Oropouche | Ministry of Works | 2009 | Provision of Project management services for a major strategic bridge rehabilitation |
Construction Sales & Services Ltd* | Rio Claro Presbyterian Primary School | Education Facilities Company Limited | 2014 | |
Jokhan General Contractors Limited* | Security Fencing installation | Atlantic LNG | 2011 | |
Atlantic Project Consultants Limited* | Technical Auditor for the Emperor Valley Zoo | Tourism Development Company Limited | 2012 | |
University of the West Indies* | Stormwater design for Orange Grove | University of the West Indies | 2012 | |
Estate Management Business Development* | Stormwater design for Factory Road development | Estate Management Business Development | 2012 | |
United Engineering Services Limited* | Airport runway lighting building works atPiarco and Crown Point airports | Airports Authority of Trinidad & Tobago | 2012 | |
D2F Technical Limited* | Yara pipe support upgrades | Yara International | 2010 |
Residential Projects ^top of page^
Client | Project | Owner | Year | Description |
R Narinesingh | Residential home | R Narinesingh | 1999 | 2-storey home, total floor area 340m2 |
K Shah & Associates | Home extension, Westmoorings | Shah & Associates | 2005 | Structural design of a 270m2 house extension built around the existing home |
K Shah & Associates | Home extension, Cascade | K Shah & Associates | 2005 | Structural design of a 350m2 three-storey house on sloping land |
A Ramsewack | Residential home | A Ramsewack | 2004 | Design and drawings for 200m2 rooftop patio to residential home |
Dr. W Mohammed* | Residential Home | Dr. W Mohammed | 2008 | Structural analysis and design drawings for an architecturally deisgned 585m2 luxury hillside home |
Tara Sant | Residential Home | Tara Sant | 2006 | Investigation and condition assessment of cracking foundations to residential home with retaining wall re-design |
V Goomansingh | Residential Home | V Goomansingh | 2007 | Architectural and structural design and drawings for a 285m2 residential home |
G deMontrichard | Residential home, Maraval | G deMontrichard | 2009 | Structural design and drawings for an architecturally-designed two-storey 450m2 residential home |
G deMontrichard* | Residential Building | G deMontrichard | 2011 | |
Invictus Chambers / The Law Chambers | Expert Witness to a boundary and retaining wall dispute | Invictus Chambers / The Law Chambers | 2013 |
Advocacy Projects ^top of page^
Client | Project | Owner | Year | Description |
Southern Concrete Ltd. | 2007 | Client's advocate on the assessment of concrete quality for use in litigation | ||
Shastri Parsad & Associates | Residential property | 2007 | Assessment of external gate failure for the purpose of litigation | |
R Kissoon | Residential Home, Palmyra | 2007 | Estimations and assessment of concrete construction for litigation purposes | |
I Khan & Associates | Damage Assessment, residential home | 2009 | Investigation and condition assessment of a damaged home for litigation and insurance purposes | |
M Boodoosingh | LBoodoosingh | 2014 | ||
ROC Imports* | Fire Damage Assessment | ROC imports | 2013 | |
Southern Concrete Limited* | Engineering assessment of concrete quality | 2009 | ||
Invictus Chambers / The Law Chambers | Expert Witness to a boundary and retaining wall dispute | Invictus Chambers / The Law Chambers | 2013 |
Building & Proposals ^top of page^
Client | Project | Owner | Year | Description |
CENGEM | Housa Trace bridge, Gasparillo | Ministry of Local Government | 2003 | Tender and quantity estimates for local bridge reconstruction |
CENGEM | Ramgoolie Trace Housing Development | National Housing Authority | 2003 | Tender and quantity estimates for housing development infrastructure (water, roads and drainage) |
CENGEM | Telecommunications towers, islandwide | TSTT | 2005 | Tender and quantity estimates for eight telecommunications towers |
Rainbow Construction Ltd. | Cipriani College Extension | CCLCS | 2006 | Development of project schedules and cashflow projections for a major college extension project |
Rainbow Construction Ltd. | Mon Repos and Hindustan Primary schools | Education Facilities Company Limited | 2008 | Development of construction methodology, project schedules, and cashflow projections for two major primary school construction projects |
T N Ramnauth & Co | Laboratory Building, Petrotrin | Petrotrin | 2008 | Tendering, and proposal package for a new 3000m2 lab facility |
Construction Sales & Services Ltd* | Rio Claro Presbyterian Primary School | Education Facilities Company Limited | 2014 | |
Associated Services Limited* | New Head office and warehouse facility | ServisAir | 2011 | |
Hookmally Ali Limited* | UWI FM new offices | University of the West Indies | 2012 | |
Montrose Vedic* | Conditional Assessment of school | Arya Samaj Board of Trinidad & Tobago | 2011 | |
Corrosion & Environmental Services Limited* | Services Building for the main Petrotrin corporate office | Petrotrin Limited | 2010 | |
Servus Limited* | Technical auditor for major office development | International Financial Corporation | 2010 | |
Aldana Street Masjid* | Major mosque expansion to two floors | Aldana Street Masjid | 2009 |
Condition Assessment ^top of page^
Client | Project | Owner | Year | Description |
R Boodoosingh | Residential home | 2001 | Investigation and condition assessment of cracking foundations to residential home | |
Ansa Chemicals* | Storage warehouse, Point Lisas | ANSA Chemicals | 2003 | Assessment of cracking and recommendations for strengthening of a warehouse mezzanine floor |
A Trotman | Alicia's Guest House | Alicia's Guest House | 2007 | Structural assessment for plannig approvals of a multi-level multi-unit hotel located on steeply sloping topography |
Scalex Construction Ltd.* | Erin Presbyterian School, Erin | Ministry of Education | 2007 | Condition assessment of a 100-yr old primary school for seismic and aging damage |
Worley Parsons* | Assessment of residential homes | Talsiman Trinidad Limited | 2007 | Condition assessment of four residential homes adjacent to a major oil explaoration facility |
Servus Limited | Albion Plaza, POS | bptt | 2009 | Structural capacity assessment, corporate headquarters |
Dr. M Rajack* | Residential home, Mayaro | 2009 | Investigation and condition assessment of cracking foundations to residential home for valuation purposes | |
RR Investments* | High Street Arcade Refurbishment | RR Investments | 2014 | |
Croton LLC* | Sun Delight Fire Assessment | Sun Delight Limited | 2013 | |
ROC Imports* | Fire Damage Assessment | ROC Imports | 2013 | |
Montrose Vedic* | Conditional Assessment of school | Arya Samaj Board of Trinidad & Tobago | 2011 | |
Servus Limited* | Condition assessment for UTC Tobago after fire event | Unit Trust Corp | 2010 | |
S Parsad & Associates | Condition assessment of a commercial building | Point Fortin Borough Corporation | 2010 |
Energy Projects ^top of page^
Client | Project | Owner | Year | Description |
British Gas* | Equipment support slab, Chaguaramas | British Gas | 2004 | Design, drawings and tender documents for Tree Assembly, Dolphin Block |
T N Ramnauth & Co | U&O Buildings, Petrotrin | Petrotrin | 2008 | Tendering, technical and procurement consultancy during the construction of three process buildings within the Petrotrin refinery |
Worley Parsons* | Phoenix Park Valve station upgrade | National Gas Company | 2007 | Infrastructure and civil works design for a major gas transfer hub, working with Venezuelan consultants |
Schlumberger Trinidad & Tobago Limited* | 3rd Party Adviser to a major Facilities Upgrade | Schlumberger Trinidad & Tobago Limited | 2014 | |
Jokhan General Contractors Limited* | Security Fencing installation | Atlantic LNG | 2011 | |
Corrosion & Environmental Services Limited* | Services Building for the main Petrotrin corporate office | Petrotrin Lmited | 2010 | |
D2F Technical Limited* | Yara pipe support upgrades | Yara International | 2010 |
QA/QC Consultancy ^top of page^
Client | Project | Owner | Year | Description |
SIS | Laboratory development and testing | SIS | 2004 | Provision of QA consultancy services on material testing methods and procedures |
D2F* | Process building, Petrotrin | Petrotrin | 2009 | Provision of quality assurance consultancy for energy sector building project |
Carillion | Baha-Mar respot, Bahamas | Baha-Mar | 2008 | Provision of quality assurance consultancy for bid proposal for a worldwide luxury resort project |
Schlumberger Trinidad & Tobago Limited* | 3rd Party Adviser to a major Facilities Upgrade | Schlumberger Trinidad & Tobago Limited | 2014 | |
Atlantic Project Consultants Limited* | Technical Auditor for the Emperor Valley Zoo | Tourism Development Company Limited | 2012 | |
Southern Concrete Limited* | Engineering assessment of concrete quality | 2009 |
HSE Consultancy ^top of page^
Client | Project | Owner | Year | Description |
A R General Construction Company Ltd.* | Corporate development | 2007 | Design and customisation of the company's Health and Safety Management systems | |
RBMR Construction | Corporate development | 2008 | Design and customisation of the company's Health and Safety Management systems |